Risk Mechanism description Likelihood Impact Rating Producer’s Risk Mitigation Strategy
Item No. | Potential Hazard | Likelihood (1-5) 1 = Extemely serious 5 = low risk | Impact on filming (1-5) 1 = Stop Filming 5 = Continue Filming | Rating (low, moderate or high) | Producer’s Risk Strategy/ Further action needed |
1 | Failure of event structures | 1 | 3 | Low | Site will be inspected as-built by …… prior to shoot commencing Infrastructure plan Safety Standards (section … ) Engineer’s certificate to be kept on file |
2 | Camera falling off stand and breaking | 3 | 1 | Moderate | Make sure that camera is screwed on as tight as possible. |
3 | While filming in the road A car hits them. | 2 | 2 | High | Be sure that the road Is clear before filming. |
4 | Using a lit candle. Potential fire accident. | 2 | 3 | Moderate | Be very carful with the lit candle. |
5 | Risk of falling out of window when filming from building. | 1 | 1 | High | Be careful when filming out of a window when high up. |
6 | Falling into the pond when acting. | 3 | 2 | Moderate | Be carful when acting near the pond. |