Friday, 20 January 2012

Risk Mechanism description Likelihood Impact Rating Producer’s Risk Mitigation Strategy


Risk Mechanism description Likelihood Impact Rating Producer’s Risk Mitigation Strategy
Item
No.

Potential Hazard
Likelihood (1-5)
1 = Extemely serious
5 = low risk
Impact on filming (1-5)
1 = Stop Filming
5 = Continue Filming
Rating (low, moderate or high)
Producer’s Risk Strategy/ Further action needed
1
Failure of event structures
1
3
Low
Site will be inspected as-built by …… prior to
shoot commencing
Infrastructure plan
Safety Standards (section … )
Engineer’s certificate to be kept on file
2
Camera falling off stand and breaking
3
1
Moderate
Make sure that camera is screwed on as tight as possible.
3
While filming in the road A car hits them.
2
2
High
Be sure that the road Is clear before filming.
4
Using a lit candle. Potential fire accident. 
2
3
Moderate
Be very carful with the lit candle.
5
Risk of falling out of window when filming from building.
1
1
High
Be careful when filming out of a window when high up.
6
Falling into the pond when acting.
3
2
Moderate
Be carful when acting near the pond.